Skip Navigation Links
Skip Navigation LinksODOS CONSULTING > News
Title:<p>Approval of Advanced Reconnaissance study for the upgrading of the existing Ptolemaida - Xino Nero National Road" (Contract No 5277)</p>
Date:27/6/2018 12:00:00 πμ
 

Short Description of the designed item:                                                                                                                                                                                            Advanced Reconnaissance Study for the upgrading-rehabilitation of the existing Ptolemaida-Xino Nero National Road (start of the new alignment) of the "Ptolemaida-Florina" section, AII category,  β4ν*type cross-section (two traffic lanes per direction, median separated (concrete barrier),  without emergency lanes) , 31km length   


ODOS CONSULTING was awarded a contract for the conducting of the Preliminary Design of Lamia-Karpenissi Road (Stavros-East portal of Tymfristos Tunnel), Section: Neochoraki-East portal of Tymfrhstos Tunnel.

17/9/2018

ODOS CONSULTING, leader of a J/V of Design Firms, was shortlisted together with two other J/Vs out of sixteen bidder J/Vs, to conduct an Advanced Reconnaissance Study (ARS, scale 1:5.000) for the design of the section Neochoraki-East portal of Timfristos tunnel, of the National Road connecting the cities of Lamia and Karpenissi in the region of Sterea Ellada (Continental Greece) in Greece. The contract for this Design was awarded to ODOS CONSULTING J/V by the General Secreteriat of Infrastru...

Read More...
 

Approval of Advanced Reconnaissance study for the upgrading of the existing Ptolemaida - Xino Nero National Road" (Contract No 5277)

27/6/2018

Short Description of the designed item:                                                                                                                                                                                            Advanced Reconnaissance Study for the upgrading-rehabilitation of the existing Ptolemaida-Xino Nero National Road (start of the new alignment) of the "Ptolemaida-Florina" section, AII category,  β4ν*type cross-section (two traffic lanes per direction, median separated ...

Read More...
 
Contract award: Final road design design, final design of intersections, Marking Signage and Safety Design of the road and the at-grade intersections and longwise drainage of Moldova corridor 16 and 25 5/4/2018

Short Description of the designed item:      

Rehabilitation design of Corridor 16 and Corridor 25.More specifically. Final road design C16- G105- R3-Costesti-Tipala-G106. In the framework of the study, improvements were made to the existing axis (Horizontal Alignment,Vertical Alignment, Superelevation, Widenings, Typical Cross-section and Shoulders). The axis passes through four (4) settlements, (total length of 12 km).  Length of the axis is 34.6 km. The width of the road consists ...

Read More...
 
See older news...
 
All contents copyright © Odos Software Ltd. All rights reserved. Contact: odos@odos.gr